What Service Antai can supply? 1. How many days do you need to produce this machine? Contact : Richard.Lee  Wooden Based Activated Carbon,Wooden Powdered Activated Carbon,Powder Activated Carbon For Decolorization,High Purity Wood Powder Activated Carbon Shanxi Xinhui Activated Carbon Co.,Ltd. , https://www.shanxixinhui.com
Type: Automatic
Product Description:
Method: Horizontal
Its working principle is that when the smoke passes through the flue before the main structure of the dust collector, the smoke is positively charged, and then the smoke enters the channel of the electrostatic precipitator with a multi-layer cathode plate. Because of the mutual adsorption between positive charge dust and cathode plate, the particles of smoke dust adsorb on the cathode and strike the cathode plate regularly, so that the smoke dust with a certain thickness falls into the dust bucket under the structure of the electrostatic precipitator under the double action of gravity and vibration, thus achieving the purpose of removing smoke dust from the smoke. Because of the large power of thermal power plants, such as 600,000 kilowatt units, the amount of coal burning per hour is about 180T, the amount of smoke and dust can be imagined. Therefore, the corresponding ESP structure is also relatively large. The cross-sectional dimension of the main structure of the ESP used in thermal power plants is about 25-40*10-15m. If the height of the ash hopper and the space height of smoke transport are added to the ESP, the height of the whole ESP is above 35 meters. For such a large steel structure, not only the independent, smoke and dust loads, but also the wind loads should be considered. Static and dynamic analysis under earthquake load. At the same time, the stability of the structure must also be considered.
Electrostatic precipitator:
The main structure of the ESP is steel structure, all welded by section steel (as shown in Figure 10 - shown), the outer surface covered with skin (thin steel plate) and insulation materials, for the convenience of design, manufacture and installation. The structure design adopts the layered form, each piece is composed of several girders of frame type, and the girders are connected between the pieces. In order to install the skin and insulation layer, the secondary beams are welded between the main beams. For such a huge structure, how to connect the beams according to the physical object, the workload and the number of elements will be very huge. According to the actual design requirements of the project and the design of the main structure of the electrostatic precipitator, the structural strength, structural stability and the maximum displacement of the main beam suspended cathode plate are mainly investigated. For the local area, the fatigue damage of the connection between the cathode plate and the main beam under long-term periodic impact is mainly investigated; the optimum frequency of dust shedding on the cathode plate is selected; the optimum stiffness of the connection between the structure surface skin (thin plate) and the main beam and the secondary beam under wind load is selected. In addition, the controller of ESP is also an important part of it, commonly used is: ALSTOM EPIC III and so on. The main function of the control dust collector is to regulate the operation of the electric field and control the charge to the dust. Intelligent controllers such as EPIC III of ALSTOM can further improve the efficiency of energy saving and emission reduction.
Â
Type
Air Volume
(m3/h)Filter Bag Qty
(Pcs)Filter Bag Size
(mm)Dust Collector Size
(mm)Dust Collector Weight (KGS)
Shipment  Volume
(M3)Compressed Air Required
(m3/min)
DMC-24
864 -Â 2700
24
130 XÂ 2000
1400 XÂ 800 XÂ 5500
800
4.48
0.27
DMC-36
1296 -Â 4050
36
130 XÂ 2000
1400 XÂ 1200 XÂ 5500
1200
6.72
0.30
DMC-60
2160 -Â 6750
60
130 XÂ 2000
2200 XÂ 1200 XÂ 5500
2000
10.56
0.37
DMC-72
2592 -Â 8100
72
130 XÂ 2000
2000 XÂ 1600 XÂ 5500
2400
12.80
0.46
DMC-100
4560 -Â 14250
100
130 XÂ 2500
2200 XÂ 2000 XÂ 6000
3340
19.80
0.55
DMC-120
5472 -Â 17100
120
130 XÂ 2500
2200 XÂ 2400 XÂ 6000
4000
23.76
0.75
DMC-150
6840 -Â 21375
150
130 XÂ 2500
2200 XÂ 3000 XÂ 6000
5000
29.70
1.00
DMC-200
9120 -Â 28500
200
130 XÂ 2500
2200 XÂ 4000 XÂ 6000
6660
39.60
1.20
DMC-280
12768 -Â 39900
280
130 XÂ 2500
2200 XÂ 5600 XÂ 6000
9300
55.44
1.50
DMC-400
37440 -Â 117000
400
130 XÂ 5000
2200 XÂ 8000 XÂ 8500
13300
123.20
1.80
DMC-560
52416 -Â 163800
560
130 XÂ 5000
2200 XÂ 11200 XÂ 8500
18600
172.48
2.00
DMC-840
78624 -Â 245700
840
130 XÂ 5000
2200 XÂ 8400 XÂ 8500 XÂ 2
28000
258.72
2.75
DMC-960
89856 -Â 280800
960
130 XÂ 5000
2200 XÂ 9600 XÂ 8500 XÂ 2
32000
295.68
3.00
Our Service
1. Our engineers can work separately according to the requirements of design for clients of the equipment. and send a customer confirmation to help customers to save costs.
2. During the manufacture of the equipment, we photograph product production progress, and sent to the customer to track the progress.
3. The goods hair go, we will send the original documents for the customer (such as packing list, bill, CO, Form E, Form A, Form F, Form M, B/L etc.)
4. We can provide customers with free English foundation drawing, installation drawings, manuals, maintenance manuals and parts drawings.
5. We can send our engineers to installation and debugging overseas, and free training of operators and maintenance workers.
6. We have a set of After-sales service system, A ID will be sent to each customer, they can log in this system that view all information to buy equipment and parts by it. We provide 24-hour online consultation.
This is specially designed machine according to your specific requirement. From engineer designing to production completion, It needs about 45-50 days.
2. What does your factory do regarding quality control?
We pay much more importance to quality control from the very begining to the end of production. Every machine will be fully assembled and carefully tested before shipment.
3. What's your machine quality guarantee?
Quality guarantee time is one year, we choose world famous brand components to keep our machine in perfect working condition.
4. Are you able to give installation and commissioning overseas? How long will it take?
YES, we supply overseas service, but customer needs to pay for the engineers flight tickets and hotel foods.
Small machine usually takes within 5Â days.
Big machine usually takes about 20 days.
5. How can IÂ trust you to deliver the right machine as IÂ ordered?
We will absolutely deliver a good quality machine as we discussed and confirmed in the order. The core of our company culture is innovation,quality, integrity and efficiency. Antai is ALIBABA'S Golden supplier with BV &TUV assessment. You can check with ALIBABA, we have never got any complaint from our customers.
Contact
Â
Â