See Xugong XCA450's strength interpretation "绎坤大移移"

In recent years, the fantasy TV drama has always had a "high fever and no retreat". The design of "instant flashing", "Yu Jian flying" and "playing with boulder array" has satisfied many viewers' illusions about super power. Once the post-production is not sophisticated enough, it will be full of loopholes and become the "five-hair special effects" in the netizen's mouth.

In fact, in real life, "finger smashing the boulder" is not impossible, but it is not a special effect, but it!

施工现场,雄安新区尚上方再生资源交易有限公司门口
Construction site, the entrance of Shang'an New Area Shangshang Renewable Resources Trading Co., Ltd.

In July, after the rain, at the entrance of Shang'an New District Shangshang Renewable Resources Trading Co., Ltd., four large-tonnage cranes were arranged in turn. Their lifting task today is to shift the front of the 240-ton boulder image by 15 meters. General Zhao, who is in charge of the hoisting construction, said: The stone is heavy and long, and the site is small and wet, which puts extremely stringent requirements on the stability and transition capability of the crane. In order to ensure the safe transfer of 100 tons of boulder, Mr. Zhao transferred four big guys in the company: Xugong XCA450, QAY260, XCT130, and a Liebherr 220-ton crane.

Lifting, panning, and then lowering, seemingly simple three steps, several crane drivers discussed for a while: the whole process must be "slow, slow". “The XCA450 crane works very accurately and has excellent micro-motion performance. It can be done in millimeters when installing wind turbines. Transferring a stone is a piece of cake for it. However, this time it is a four-car suspension. It is necessary to cooperate with each other. Once a slight shift occurs in one party, it may cause irreparable big mistakes." Master Yang, the operator, said with confidence.

施工现场,四台起重机轻松起吊、缓慢就位
On the construction site, four cranes are easily lifted and slowly placed

At the construction site, the four cranes were easily lifted and slowly placed, and the entire work from assembly to dismantling took only 5 hours. The precise and stable construction performance made the construction workers on the scene full of praise! At this point, 100 tons of boulder smoothly "moving"!

No special effects, no filters, more construction beautiful pictures for you!

Changchun, Jilin

The Changchun Olympic Sports Center covers an area of ​​about 1 million square meters, and its scale exceeds the newly built Olympic Sports Center in Shenyang, making it the largest in the Northeast. At present, the stadium, gymnasium, swimming pool and national fitness center have entered the final stage. The picture shows Xugong XCT25 and QY25k5a as the peripheral baffle for the stadium.

长春奥体中心
Changchun Olympic Sports Center

Guizhou Xingyi

Ba Ling Park, Xingyi City, Guizhou Province is currently the only park in Ba Ling Town, Xingyi City. Recently, Xugong XCT55L6 and QY75K are the top of the park pavilion. After the completion of this project, it will provide leisure and entertainment venues for residents of Ba Ling Town.

贵州省兴义市巴玲公园
Ba Ling Park, Xingyi City, Guizhou Province

Jining City, Shandong Province

The XCT80L6 is equipped with a jib and a full extension arm to assist the construction of the storage center of the Zoucheng Yankuang Group in Jining City.

济宁市邹城兖矿集团仓储中心
Jining City Zoucheng Yankuang Group Storage Center

Jiangxi Yinzhou

赣州市九方巨亿沃尔顿酒店
Quzhou Jiufang Juyi Walton Hotel

The Jiufang Juyi Walton Hotel in Zhangzhou City is 105 meters high and the XCA220 is 112 meters long. It is perfect for installing air conditioners in place. (This article is from Xugong)

Related News: Xugong Crane Construction Site

Side Hung Door Aluminum Profile

Side Hung Door Aluminum Profile,Aluminum Door Profiles,Aluminum Profiles For Doors And Windows,Aluminum Door Frame Profiles

Wuqiang Xingdou International Trade Co., Ltd , https://www.xdaluminumproducts.com