High pressure control valve surfacing repair program

No. 1 Zhanjiang Power Plant Turbine No. 1 high-pressure regulating valve fails to open, seriously affecting the safe and stable operation of the unit. Disassembly of the valve inspection and found that high-pressure governor valve seat sink 10 mm, resulting in valve disc guide shoulder away from the guide groove, steam can not be properly adjusted. In view of the short time of the unit repair, the seat sinking site is difficult to restore, the decision to use surfacing, increase the height of the guide shoulder to achieve the restoration of the original use of high pressure main steam valve function. 1 high-pressure main steam valve repair program 1.1 valve disc guide shoulder working mechanism Unit 2 for the East Turbine Factory (N300-16.7 / 537 / 537-3 type) turbine, its high pressure main steam valve Is composed of a main steam valve and two regulating valves, high pressure regulating valve is used to regulate the intake cylinder pressure. When the unit is running, the oil motive serves as a mechanical lifting device, so that the valve disc guide shoulder moves up and down along the guide groove to control the opening of the valve disc. When the unit is running, the high-temperature steam of the regulating valve is 16.7 MPa and 537 ° C. The guiding shoulder mainly receives thermal stress and certain circumferential shear stress. The No. 1 high-pressure regulator valve disc and valve seat with a diameter of 170 mm, the valve disc structure shown in Figure 1, the guide shoulder size of 55 mm × 30 mm × 10 mm (height × width × thickness). Disc material with 20Cr3MoWVA alloy steel, in order to improve the performance of valve disc cavitation erosion, the surface of the nitriding temperature treatment. 1.2 The choice of welding materials and welding equipment According to the working conditions of the regulating valve, valve disc guide shoulder both to ensure adequate high temperature strength, but also to meet a certain degree of wear resistance. In view of unit repair, can not be purchased to the best matching materials, reference to the principle of the choice of welding materials and mechanical properties of the welding material analysis, the selection of materials and similar parent material TIG -R34 (12Cr2MoWVTIB, Φ2.5 mm) welding wire. Welding equipment used Lincoln V300-1 and argon arc welding kit; temperature monitoring using the United States MX2 infrared thermometer. 2 Analysis of welding performance According to the formula of carbon equivalent formula, the material 20Cr3MoWVA main features are more carbon and alloy elements, welding and heat treatment zone prone to harden the structure, when the weldment rigidity and joint stress is large, prone to Cold crack. After nitriding valve disc, the surface hardness up to HV900, easy to crack when welding. 3 surfacing process 3.1 process route polished before cleaning - preheating - surfacing - welding heat treatment - after welding turning. 3.2 Welding preparation First of all, with the angular grinding wheel to thoroughly clean and remove the surfacing within 20 mm nitriding layer, grinding depth should be greater than 0.4 mm, measuring the hardness of polished parts, and to ensure that the welding area to HB185 ~ 321 requirements. According to JB4730-94 testing standards, check the quality of the polished guide shoulder surface without cracks, slag and other defects, to meet the level Ⅰ standard. Then use acetone to clean valve plate and welding area around the range of 50 mm, to ensure that no water, oil, etc .; with sandpaper to remove oil and rust stains on the surface of TIG wire and other dirt. 3.3 Welding process and parameters Using oxyacetylene flame heating preheating before welding, preheating temperature of 350 ~ 400 ℃, with a thermometer to measure the preheating temperature. Valve plate exposed welding parts, other parts covered with asbestos cloth to prevent electric arc burns. Process parameters I = 80 ~ 90 A, argon flow 8 ~ 10L / min, DC is positive, the voltage range of 10 ~ 15 V, welding speed 30 ~ 45 mm / min, swing width per channel ≤ 10 mm, ≤4 mm. Preheat temperature reaches after the start of welding, the interlayer temperature control at 300 ~ 400 ℃, the welding process is not allowed to produce any defects, focus on inspection lead, Arc Department, found defects immediately removed with the angle grinder. In order to ensure the machining allowance, according to the figure surfacing size, the outer diameter increases 5 mm, the inner diameter reduces 5 mm, the pile height 13 mm. While surfacing is completed and then surfacing the other side. After welding, with aluminum silicate refractory cotton coated slow cooling, cold welding parts to 100 ~ 150 ℃, immediately after welding local heat treatment. Heat treatment using flame heating to 640 ~ 660 ℃, holding 30min, with a thermometer monitoring, heating rate and cooling rate were <300 ℃ / h, cooling to below 300 ℃ can be controlled, coated with aluminum silicate fiber blanket cooling Slow cooling. 4 after-welding inspection Valve plate in accordance with the completion of the process of surfacing and mechanical processing, the penetration of flaw detection and ultrasonic flaw detection, weld no cracks, slag, porosity and other defects quality, surfacing quality JB4730-94 standard grade Ⅰ Requirements; hardness test on the processing surface, the average hardness value of HB241, and the hardness of the original base material close to meet the performance of the workpiece. 5 Conclusion Unit 1 No. 1 high-pressure main steam valve welding repair and operation of nearly 1 year after the dismantling of the unit overhaul inspection, surfacing of the valve plate shoulder run 51616 h did not find any problems. Can be seen with TIG-R34 welding wire 20Cr3MoWVA welding materials preheated 350 ~ 400 ℃, 640 ~ 650 ℃ after welding, holding 30min welding process is reasonable and feasible. It not only solved the normal high pressure main steam regulating valve to regulate steam, but also saved tens of thousands of yuan of funds.

Quick Details



Place of Origin:Zhejiang, China (Mainland)

Brand Name:Hanray

Warranty:1 Years

OE NO.:4L0698007, 4L0698007A

Size:OEM Standard

Warranty:12 Months

Application:Auto Suspension Parts

Product name:7L0698007

Car Make:for Audi Porsche Cayenne VW Touareg

Model Number:4L0698007, 4L0698007A

Type:Air Compressor

Packaging & Delivery

Packaging Details:Neutral box or as customers' request

Delivery Time:Shipped in 7 days after payment

Air compressor suspension for Audi 4L0698007, 4L0698007A, 7L8616006, 7L8616006A,95535890104, 95535890105 7L0698007

Product Description

Car Make

for AUDI Q7 PORSCHE CAYENNE VOLKSWAGEN TOUAREG 

OE No.


4L0698007A, 7L8616006, 7L8616006A,95535890104, 95535890105 7L0698007

Brand

FAT

MOQ

1pc

Size

Standard 

Certificate

German Rhine,TS16949 and ISO9001

Warranty

12 Months

Payment Terms

T/T, Western union, Paypal,Alipay 

Shipping Terms

DHL,UPS,Fedex,EMS,by sea,etc

Delivery Time

1-4 working days after the receipt of the payment

Packaging

Neutral packing and accept customer's special packaging demand.

Our advantages

Factory directly sale,high quality and competitive price.Professional 

in the manufacture of air suspension

Type

Air Suspension Bellow , Air spring , Air shock sbsorber , Air suspension , 

suspension pneumatique , Damper, air suspension repair kits ,Auto Parts

 

 

OEM NO. 95535890104, 95535890105, 95535890101

               7L8616006, 7L8616006A, 7L0698007 

               4L0698007, 4L0698007A, 4L0698007B



Air Compressor For Audi

Air Compressor For Audi,Air Suspension Compressor For Audi,Mini Compressor For Audi,Air Pump For Audi

Hangzhou Hanray Industry Co., Ltd , https://www.aircompressor.pl