Construction Unit: Xiamen Construction Development Company Postal address: Software Park Phase II 30#502 Design Unit: Fujian Minke Environmental Protection Technology Development Co., Ltd. (EIA) Metal Bearings ,White Metal Bearing,Metal Ball Bearings,Precision Steel Balls Ningbo Metal Sharing Supply Chain Management Co., Ltd , https://www.zenlesmart.com
Region: Fujian Progress: Environmental Impact Assessment Construction Period: 2011-2012 Major equipment: cranes, firefighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, and lighting facilities.
Project Profile: The project is located in the west area of ​​Wuyuanwan, west of Jinshan Road, east of Yunding North Road, north and south of Wuyuanwan Road, and consists of seven plots (E28, E30, E41, E55, E57, E36-1, E36-2) Composition. This project is the E-28 plot; the west side is Xianhu Road, the south is adjacent to Wuhu East Road, and the right side is the 40m street heart green belt. The total land area of ​​the local block is 47,652,357 square meters, and the plot ratio is 3.0; the construction area is not more than 35% and the greening rate is not less than 30%; it is mainly a high-rise residential building, and it also has a street-level commercial and fresh convenience store. A high-rise residential project that integrates open and close gates, public mobile communication base stations, property management, and supporting public buildings. The total project investment is unknown.
Zip code: 361000
Contact: Li Gong Phone
Postal address: No. 100, Jinshan Avenue, Cangshan District, Fuzhou City, Fujian Province 3500000
Contact: Lin Gong Phone
Haixi first E-28 block real estate development project
Project Name: Real Estate Development Project of Block E-28 in Haixi (from 2011 to 2012, the total project investment is unknown)
Related Developments: Tower Crane Infrastructure Project